Description
Scope of services Data backup and documentation Introduction to the Festo Automation Suite software Configuration and parameterization Remote support during commissioning of 1-axis systems with a safety module Test of system Checking of electrical connections and of travel path Work involved on site 3 hours of work Customer requirements Qualified personnel responsible for the machine must be present on the agreed date YJKP kit must be assembled mechanically 24 V logic and 230/400 V load voltage must be made available Switch and Ethernet cable must be available Local installation of FFT-software (see Support Portal) Local administrator rights Local installation of TeamViewer or Bomgar communication software Stable internet connection Provision of services 8-10 days subject to agreement
Additional information
| series | Actuators, Electric Actuators |
|---|





